Use when forecasting, estimating, or sizing risk — anchor on base rates, give ranges, update prior→likelihood→posterior on evidence, and factor unmeasured…

Skill by tjboudreaux

IndexedMIT★ 1,668
Write a review

Chalk Labs

Need help deploying thinking-probabilistic?

Chalk Labs sets up agents like this inside real teams: connected to your tools, tested on your data, with a human in the loop where it matters.

Book a call

Install

Works with Claude Code, Claude apps, Codex, Cursor, Gemini CLI, GitHub Copilot, VS Code, OpenCode, Goose, Windsurf. Read the repository before you give any tool access to your data.

npx agentmarket install skill/tjboudreaux-thinking-probabilistic

Asks which of your tools to add it to (Claude Code, Codex, Cursor, VS Code, Windsurf, Gemini CLI, Claude Desktop) and shows the change first. See https://agentmart.dev/cli.

Get the weekly diff

The weekly diff: one email a week with new agent tools, notable updates and grade changes, plus security alerts for tools you follow. Double opt-in, one-click unsubscribe.

We use your email only for this newsletter. Privacy

About

Use when forecasting, estimating, or sizing risk — anchor on base rates, give ranges, update prior→likelihood→posterior on evidence, and factor unmeasured quantities into order-of-magnitude bounds.

No reviews yet. Installed it? Reviews come from verified installers only. How reviews work

Permissions

What this skill can do and what it asks for, from its SKILL.md. Checked Oct 25, 2026.

Tools
No tools found
Secrets
None asked for
Install scripts
None found

Network hosts it talks to 1

  • codeload.github.com · found in install command

Files it touches

  • ~/.claude/skills/thinking-probabilistic

What's inside

Skill name
thinking-probabilistic
Description
Use when forecasting, estimating, or sizing risk — anchor on base rates, give ranges, update prior→likelihood→posterior on evidence, and factor unmeasured quantities into order-of-magnitude bounds.
License
MIT
Instructions
51 lines in SKILL.md · view on GitHub

Files (1)

  • SKILL.md

SKILL.md (first lines)

# Probabilistic Thinking

**Core rule:** State beliefs as numbers and ranges, not vibes. Anchor on a base rate, update with an explicit likelihood, and bound unknowns by factoring them — never invent false precision.

## When to Use

- Timeline, effort, or outcome forecasts where the true value is uncertain.
- Risk sizing for a change, migration, deploy, or launch.
- Any moment you are about to state a confident single number you cannot actually know.
- New evidence arrives and a prior estimate should move.

## When NOT to Use

- The quantity is measurable or look-up-able — measure or look it up.
- The decision is invariant across the whole plausible range — skip the estimate and act.
- There is no real reference class and you would invent a base rate — label it a guess, not a calibrated forecast.
- You only need a binary gate and already have a decisive observation — do not pad with ceremony.

## Procedure

1. **Define a checkable claim:** outcome + timeframe + unit. Prefer a falsifiable statement over vague language ("likely").
2. **Lock a prior and challenge it:** name a reference-class base rate and at least one credible alternative path/hypothesis with its rate. Pull the prior toward the base rate unless you write a concrete reason for deviation. Then state the strongest evidence-based case that your chosen prior or range is wrong, what estimate it supports, and revise if that countercase survives. Convert vague words to numbers (e.g. "likely" ≈ 65–80%).
3. **Express a range, not a point:** give at least one confidence interval (50% and 80% preferred). Assume overconfidence; widen intervals when the outside view is thin.
4. **Update prior → likelihood → posterior when evidence arrives:**
   - Prior odds = p / (1 − p).
   - Likelihood ratio LR = P(E|H) / P(E|¬H). LR > 1 supports H; LR = 1 is noise; LR < 1 undermines H.
   - Posterior odds = prior odds × LR (multiply even when LR < 1); p = odds / (1 + odds).
   - Strength bands for distance from 1: weak ~1.5–3×, moderate 3–10×, strong 10–100×, definitive 100×+.
   - Yesterday's posterior is today's prior for the next evidence. For rare events, start from the base rate — vivid positives still leave most mass on false alarms.
5. **Fermi-bound unmeasured quantities** (only when you need a magnitude you cannot measure/look up):
   - Decompose: Quantity = Factor₁ × Factor₂ × … (or sum of components).
   - Bound each factor with a range; use one-significant-figure geometric means for order-of-magnitude.
   - Multiply; report "~X within 3–5×"; sanity-check whether a 10× error would change the decision; replace any factor that is actually lookup-able.
   - Skip Fermi when the number is cheaply measurable, when the decision needs tighter than ~3–5× precision, or when every factor is pure invention.
6. **State the final estimate for checking:** claim, range/CIs, key uncertainties, and the observation that would prove it wrong. Stop when the decision is stable across the remaining range or the next update needs new evidence you do not have.

## Output

1. **Claim** — falsifiable statement with timeframe.
2. **Prior** — base rate, alternative path, adjustment reason, strongest countercase, and resulting prior probability.
3. **Range** — confidence intervals (not a lone point).
4. **Updates** — each evidence row: prior, LR (or explicit heuristic Δ), posterior.
5. **Fermi bounds** (if used) — factor product and "~X within N×".
6. **Decision implication** — what changes if the true value is at the low vs high end of the range.

## Verification

- **Falsify/stop:** if you cannot name a base rate, alternative, or serious countercase, label the estimate as a guess rather than calibrated. If the decision is unchanged across the full range, stop estimating. If new evidence arrives and the number does not move (or moves without an LR/Δ), recompute.
- **Over-application guard:** do not dress checkable facts as probabilities, invent reference classes, or Fermi-decompose quantities you can measure. Do not report three significant figures on a 5×-uncertain product. For rare events, refuse jumps from one vivid hit to near-certainty without the base-rate prior.

From tjboudreaux/cc-thinking-skills, MIT.

More from tjboudreaux/cc-thinking-skills

Signals

Stars
1,668
Forks
185
Open issues
2
Last commit (this folder)
Jul 17, 2026 (3 months ago)
Last release
Aug 4, 2026 (2 months ago)

From GitHub (fetched Oct 24, 2026).

Details

License
MIT
First seen
Oct 24, 2026
Last checked
Oct 24, 2026

More from tjboudreaux

Done for you

Rather not set it up yourself?

Chalk Labs scopes, builds and runs agents for your team: the task audit, the eval harness, the integrations and the weekly ops report. Fixed scope, priced before we start.

See how we build AI agents →Read the case studies

Chalk Labs is a two-founder AI and growth studio. We build AI agents, CRMs and MVPs for Web3 and AI companies, and have shipped 50+ product and token launches.

launches shipped
50+
launches shipped
media placements
500+
media placements
founders on every account
2
founders on every account

Press we've placed: Forbes · CoinDesk · Decrypt · Cointelegraph · The Block

Rahil Jain, Co-founder, Chalk Labs. Ex-Goldman Sachs engineer. You talk to the person who builds it.

Get thinking-probabilistic running in your business

Tell us what you want to automate. A founder replies within one working day with a plan, not a pitch deck.

Goes to the Chalk Labs founders, not the newsletter. Privacy

Need help deploying thinking-probabilistic?

CallGet help
Cite this page

thinking-probabilistic skill. Agent Mart. https://agentmart.dev/skills/tjboudreaux-thinking-probabilistic (last updated 2026-10-24)