sop-dev-work-breakdown
SOP to break approved scope into an executable Work Breakdown Document — a Foundation block plus Feature vertical slices (DB to API to UI), with task owners…
Skill by ygavrilov
Chalk Labs
Need help deploying sop-dev-work-breakdown?
Chalk Labs sets up agents like this inside real teams: connected to your tools, tested on your data, with a human in the loop where it matters.
Install
Works with Claude Code, Claude apps, Codex, Cursor, Gemini CLI, GitHub Copilot, VS Code, OpenCode, Goose, Windsurf. Read the repository before you give any tool access to your data.
npx agentmarket install skill/ygavrilov-sop-dev-work-breakdown
Asks which of your tools to add it to (Claude Code, Codex, Cursor, VS Code, Windsurf, Gemini CLI, Claude Desktop) and shows the change first. See https://agentmart.dev/cli.
Get the weekly diff
The weekly diff: one email a week with new agent tools, notable updates and grade changes, plus security alerts for tools you follow. Double opt-in, one-click unsubscribe.
About
Use cases: documents, design, backend, sales
Reviews
Write a reviewNo reviews yet. Installed it? Reviews come from verified installers only. How reviews work
Permissions
What this skill can do and what it asks for, from its SKILL.md. Checked Oct 25, 2026.
- Tools
- No tools found
- Secrets
- None asked for
- Install scripts
- None found
Network hosts it talks to 1
codeload.github.com· found in install command
Files it touches
~/.claude/skills/sop-dev-work-breakdown
Tools it pre-approves 3
From allowed-tools in SKILL.md: the agent may use these without asking you each time.
Read,Write,Edit
What's inside
- Skill name
sop-dev-work-breakdown- Description
- SOP to break approved scope into an executable Work Breakdown Document — a Foundation block plus Feature vertical slices (DB to API to UI), with task owners, blocked-by/blocks dependencies, critical path, and a parallelism map. Use when a worker is delegated a dev planning task, or asked to "break down the work", "produce a WBD", "sequence the critical path", "map parallel work". SDLC Phase 3. Best run by the lead tier.
- License
- unknown
- Allowed tools
- Read,, Write,, Edit
- Instructions
- 7 lines in SKILL.md · view on GitHub
Files (2)
- SKILL.md
- procedure.md
The license isn't open source, so the instructions aren't shown here. Read SKILL.md on GitHub
More from ygavrilov/plugin-personal-os
- 0.492score
sop-wiki
ygavrilov
SOP for the full personal-os wiki lifecycle — store durable knowledge, retrieve related projects/ideas/concepts, or check consistency.
SkillCFreshness: C★ 1Claude Code +9 - 0.487score
workflow-triage-tasks
ygavrilov
PA task triage.
SkillCFreshness: C★ 1Claude Code +9 - 0.487score
workflow-deliver-feature
ygavrilov
PA orchestrator for end-to-end software delivery.
SkillCFreshness: C★ 1Claude Code +9 - 0.487score
workflow-process-message
ygavrilov
PA message processing protocol.
SkillCFreshness: C★ 1Claude Code +9 - 0.487score
sop-dev-test
ygavrilov
SOP to QA an implemented feature — map acceptance criteria to code, run the existing test suite, write missing tests, validate behavior, record defects, and…
SkillCFreshness: C★ 1Claude Code +9 - 0.487score
research
ygavrilov
SOP to run verified, on-demand research on any question and write a structured research report to research/.
SkillCFreshness: C★ 1Claude Code - 0.487score
setup-skill-permissions
ygavrilov
Scan every project skill's allowed-tools frontmatter and write a merged, deduplicated, sorted allowlist into the project .claude/settings.json, so all skill…
SkillCFreshness: C★ 1Claude Code +9 - 0.487score
sop-dev-architecture
ygavrilov
SOP to design a technical solution and produce an Architecture Decision Document (ADD) — context review, options analysis (2-3 approaches with trade-offs)…
SkillCFreshness: C★ 1Claude Code +9 - 0.487score
sop-dev-implement
ygavrilov
SOP to implement a single Work Breakdown task / vertical slice against a repo — read context, locate the code, make the change following the project's…
SkillCFreshness: C★ 1Claude Code +9 - 0.487score
sop-dev-ingest-repo
ygavrilov
SOP to onboard an existing codebase into personal-os — analyze a repo across technology / architecture / standards / state and produce a populated…
SkillCFreshness: C★ 1Claude Code +9 - 0.487score
sop-dev-requirements
ygavrilov
SOP to turn a plain-language dev request into a structured requirements document (PRD for user-facing features, RFD for technical changes) via a structured…
SkillCFreshness: C★ 1Claude Code +9 - 0.487score
sop-draft-reply
ygavrilov
SOP to write a reply draft (email or message) to a file in drafts/.
SkillCFreshness: C★ 1Claude Code +9
Signals
- Stars
- 1
- Forks
- 0
- Open issues
- 0
- Last commit (this folder)
- Jun 9, 2026 (4 months ago)
From GitHub (fetched Oct 24, 2026).
Details
- License
- License unknown
- Repository
- github.com/ygavrilov/plugin-personal-os
- First seen
- Oct 24, 2026
- Last checked
- Oct 24, 2026
- Source
- GitHubgithub-graphql
More from ygavrilov
- 0.547score
plugin-assistant
ygavrilov
Create or edit Claude Code plugins based on official documentation.
SkillBFreshness: B★ 2Claude Code +9 - 0.547score
agent-assistant
ygavrilov
Create or edit Claude Code subagent (agent) definition files based on official documentation.
SkillBFreshness: B★ 2Claude Code +9 - 0.547score
skill-assistant
ygavrilov
Create or edit Claude Code skills based on official documentation.
SkillBFreshness: B★ 2Claude Code +9 - 0.497score
llm-wiki-ops
ygavrilov
Execute LLM wiki operations on a codebase.
SkillCFreshness: C★ 2Claude Code +9 - 0.497score
llm-wiki
ygavrilov
LLM-powered wiki knowledge base.
SkillCFreshness: C★ 2Claude Code +9 - 0.492score
sop-wiki
ygavrilov
SOP for the full personal-os wiki lifecycle — store durable knowledge, retrieve related projects/ideas/concepts, or check consistency.
SkillCFreshness: C★ 1Claude Code +9
Done for you
Rather not set it up yourself?
Chalk Labs scopes, builds and runs agents for your team: the task audit, the eval harness, the integrations and the weekly ops report. Fixed scope, priced before we start.
See how we build AI agents →Read the case studies
Chalk Labs is a two-founder AI and growth studio. We build AI agents, CRMs and MVPs for Web3 and AI companies, and have shipped 50+ product and token launches.
- launches shipped
- 50+
- launches shipped
- media placements
- 500+
- media placements
- founders on every account
- 2
- founders on every account
Press we've placed: Forbes · CoinDesk · Decrypt · Cointelegraph · The Block
Rahil Jain, Co-founder, Chalk Labs. Ex-Goldman Sachs engineer. You talk to the person who builds it.
Get sop-dev-work-breakdown running in your business
Tell us what you want to automate. A founder replies within one working day with a plan, not a pitch deck.
Cite this page
sop-dev-work-breakdown skill. Agent Mart. https://agentmart.dev/skills/ygavrilov-sop-dev-work-breakdown (last updated 2026-10-24)